Skip to main content
Quality Engineering

Test infrastructure your team can actually maintain.

A structured test strategy, a working automation framework, and CI-integrated quality gates — built for your codebase, then handed off to your team with training.

Framework-First
Test architecture
Strategy and structure before scripts
CI-Integrated
Quality gates
Tests run on every commit and PR
Multi-Layer
Coverage pyramid
Unit, integration, API, E2E, performance
Transferable
Your team owns it
Full handoff with documentation and training

Test Strategy & Architecture Design

A structured assessment of your current test coverage, gaps, and risk areas — followed by a test strategy that maps test types to application layers, defines ownership, and sequences implementation so your team builds on a solid foundation.

Test Automation Framework Setup

A configured, running automation framework — Playwright, Cypress, or Jest/xUnit depending on your stack — with project structure, naming conventions, test data management, and CI hooks. Not a prototype; a production-grade foundation your team extends from day one.

CI/CD Quality Gates

Tests integrated into your build pipeline so every commit and pull request runs the relevant suite. Quality gates that block merges when coverage drops or critical tests fail — enforced by the pipeline, not by discipline alone.

Performance & Load Testing

Load tests, stress tests, and performance baselines using k6 or Artillery — configured to run in CI and alert on regressions. Identify bottlenecks before your users do, with repeatable benchmarks your team can run before any release.

Security Testing

Automated security scanning integrated into the pipeline — OWASP dependency checks, API security validation, and authenticated vulnerability scans. Surface security issues during development, not during a penetration test three weeks before launch.

Accessibility Testing

Automated WCAG 2.1 AA compliance checks using axe and Lighthouse, integrated into CI. Catch accessibility regressions on every build so compliance is continuous, not a one-time audit that drifts out of date with every subsequent sprint.

Test Architecture

The right tests at the right layer

Not a pile of flaky E2E tests. A balanced test pyramid where each layer catches different categories of defects — fast feedback at the base, high confidence at the peak.

Click any tier to explore what belongs there

Our Implementation Process

1
Week 1

Test Audit & Gap Analysis

We review your existing codebase, CI pipeline, test coverage, and defect patterns. The audit identifies which layers are undertested, where manual QA creates bottlenecks, and which test types will deliver the highest risk reduction per effort.

Test audit report, coverage heatmap, prioritized gap analysis
2
Week 2

Test Strategy & Architecture

Based on the audit, we design a test strategy that maps test types to application layers, defines the coverage pyramid targets, selects frameworks and tools, and sequences the implementation so the highest-risk gaps are addressed first.

Test strategy document, framework selection rationale, implementation sequence
3
Week 3–5

Framework Setup & Initial Suite

We configure the chosen frameworks, establish project structure and conventions, write the first suite of critical-path tests, and set up test data management. Your team pair-programs with us during this phase to build ownership from the start.

Running test framework, initial test suite, configuration documentation
4
Week 5–6

CI Integration & Quality Gates

Tests are wired into your CI/CD pipeline with quality gates that enforce coverage thresholds and block failing builds. Performance baselines and security scans are added to the pipeline. Dashboard reporting gives visibility into test health across branches.

CI pipeline configuration, quality gate rules, test dashboard
5
Week 7–8

Training & Handoff

Your team receives hands-on training on the framework, conventions, and CI configuration. We deliver a runbook covering how to write new tests, debug failures, maintain test data, and extend the framework. The codebase is yours — no consultant dependency.

Training sessions, team runbook, framework extension guide, handoff sign-off

Key Capabilities

  • Test strategy and architecture design
  • Test automation framework setup (Playwright, Cypress, Jest, xUnit, NUnit)
  • CI/CD quality gate integration (GitHub Actions, Azure DevOps)
  • Performance and load testing (k6, Artillery)
  • Security testing and OWASP compliance scanning
  • Accessibility testing and WCAG 2.1 AA automation
  • API testing and contract testing (Postman, Pact)
  • Test data management and fixture strategies
  • Coverage analysis and gap identification
  • Team training and framework handoff

Technologies

PlaywrightCypressJestxUnit / NUnitk6ArtilleryPostmanOWASP ZAPLighthouseaxeGitHub ActionsAzure DevOps

Engagement Models

Frequently Asked Questions

Will my team be able to maintain the test framework after the engagement ends?

That is the explicit goal of every engagement. We pair-program with your engineers during framework setup, deliver a runbook covering test creation, debugging, data management, and framework extension, and run dedicated training sessions before handoff. The framework uses industry-standard tools your developers already know or can learn quickly — not a proprietary system that requires us to maintain it.

Which test automation framework do you recommend?

It depends on your stack and team. For web applications, Playwright is our default recommendation — it handles cross-browser testing, is fast, and has strong TypeScript support. For teams already invested in Cypress, we work with that. For .NET backends, xUnit or NUnit. For Node.js APIs, Jest with Supertest. The framework decision is made during the test strategy phase based on your codebase, CI environment, and team skills — not our preference.

How do you decide which tests to write first?

The test audit identifies your highest-risk, lowest-coverage areas — the code paths where a bug would cause the most damage and where you currently have no automated safety net. We prioritize critical user journeys and high-change-frequency modules first. The goal is maximum risk reduction per test written, not a coverage percentage target for its own sake.

Can you integrate tests into our existing CI/CD pipeline?

Yes. We work with GitHub Actions, Azure DevOps, GitLab CI, Jenkins, and CircleCI. Quality gates are configured so tests run on every commit and PR, with coverage thresholds that block merges when they drop below the agreed floor. If your pipeline needs restructuring to support parallel test execution or faster feedback loops, we handle that as part of the CI integration step.

Should we hire QA engineers or outsource test automation?

Most teams benefit from a hybrid approach. We set up the framework, write the initial critical-path suite, integrate it into CI, and train your developers to write tests as part of their workflow — because the people closest to the code write the best tests. For teams that want dedicated QE capacity without a full-time hire, our ongoing partnership model embeds a QE engineer in your team on a monthly basis.

What if we already have some tests but they are unreliable or slow?

The test audit covers existing test suites — we analyze flaky tests, slow runners, and architectural issues that make tests brittle. Common fixes include isolating test data, parallelizing execution, replacing brittle selectors with stable ones, and restructuring tests that depend on execution order. We stabilize what is worth keeping and replace what is not, rather than starting from scratch.

Ready to build test infrastructure that actually sticks?

Book a 30-minute call. We will review your current test coverage, CI pipeline, and release process — and outline what a structured QE engagement looks like for your codebase.